Grove has completed the design and build mechanical package for the 150-bed Hampton by Hilton Hotel, constructed over 6 storeys, with ground floor hospitality and back of house areas. The development was the UK’s first fully compliant 2018 brand prototype hotel.
Location
High Wycombe
Value
£3,400,000.00

To improve efficiencies on site we prefabricated all risers within our prefabrication facilities. Early engagement with the design team ensured the design could be fine-tuned to incorporate riser modules. We also designed and supplied the rooftop packaged plantroom.
The building was handed over in June 2021.

What we delivered
Mechanical Services included:
- LTHW Heating
- Domestic Services
- Above Ground Drainage
- Natural Gas
- Sanitary Ware
- HVRF Air Conditioning
- Mechanical Ventilation
- Kitchen Extract Ventilation
- BMS (including electrical wiring)
- Dry Risers
- Thermal Insulation