Grove has completed the mechanical package at Deller & Palmerston Apartments. The development consisted of 186 apartments spread across 4 separate tower blocks: 17 storeys, 15 storeys, 10 storeys and 6 storeys. Site logistics were challenging due to an elevated section of main carriageway running through the site.
Location
Harrow
Value
£3,600,000.00

The challenge
To improve efficiencies on site we prefabricated all risers and plant skids offsite within our prefabrication facilities. Early engagement with the design team ensured the design could be fine-tuned to incorporate riser modules.


The solution
Plant skids were designed to specific dimensions to ensure they could be safely manoeuvred into position.
The building was handed over in August 2023.


What we delivered
Mechanical Services included:
- Air Source Heat Pumps
- LTHW Heating
- Domestic Services
- Sanitary Ware
- Above Ground Drainage
- Rainwater Drainage
- Natural Gas
- Air Conditioning
- Mechanical Ventilation
- Apartment Heat Recovery Ventilation
- Smoke Ventilation
- Car Park Ventilation
- BMS (including electrical wiring)
- Thermal Insulation