Grove has completed the design and build mechanical package for the 197-bed Hilton Garden Inn Hotel which has been constructed beside the start/finish line on Silverstone Racetrack and constructed over 6 storeys.
Location
Northamptonshire
Value
£3,900,000.00

The challenge
The hotel was designed as an entertainment venue with all trackside rooms having the facility to be converted into entertainment suites on race days which coincides with the state-of-the-art roof top bar and private dining with spectacular views of the course. The link bridge to Silverstone Wing Building was designed to provide VIPs with direct access to the pits from the hotel.

The solution
To improve efficiencies on site we prefabricated all risers and plant skids offsite within our prefabrication facilities. Early engagement with the design team ensured the design could be fine-tuned to incorporate riser modules. Plant skids were designed to specific dimensions to ensure they could be safely manoeuvred into position.
The building was handed over in June 2023.


What we provided
Mechanical Services included:
- LTHW Heating
- Domestic Services
- Above Ground Drainage
- Natural Gas
- Flue Dilution System
- Sanitary Ware
- VRF Air Conditioning
- Mechanical Ventilation
- Kitchen Extract Ventilation
- BMS (including electrical wiring)
- Dry Risers
- Thermal Insulation